Standard Post with Image

Southeast Asia's Biggest Wind Power Plant

Listen to the story

The Monsoon Wind Power Company is building a wind power plant in the Lao PDR. ADB, multilateral organizations, and private sector partners are cofinancing what is poised to become the largest wind power facility in Southeast Asia.

Cross-Border Electricity

Power exports are one of the key economic drivers of the Lao People’s Democratic Republic (Lao PDR). The country is focusing on promoting cross-border power exports while meeting domestic electricity demands to drive socioeconomic growth. Developing large hydropower projects and exporting electricity to neighboring countries in the Greater Mekong Subregion, such as Thailand and Viet Nam, have been key government priorities. The Lao PDR seeks to establish itself as a major electricity exporter for the region.

Aside from large hydropower, the Lao PDR has the potential to develop renewable energy sources such as solar, wind, biomass, and small hydropower. The government has also been exploring solar and wind resources to diversify the country’s energy resources, which can provide economic benefits similar to hydropower but with a lower ecological and social imprint.

The Monsoon Wind Power Company Limited (Monsoon) is building the first wind power plant in the Lao PDR. Set to be Southeast Asia’s largest wind power plant, the project is a step forward in the country’s energy diversification. Wind power’s seasonality is countercyclical to rainfall in the Lao PDR, which makes the resource highly complementary to the country’s hydropower generation.

Electricity produced by Monsoon will be exported to neighboring Viet Nam. It will be sold to Vietnam Electricity, the state-owned electricity utility, through a power purchase agreement.

Climate Investments

The 600-megawatt Monsoon Wind Power Project, which will include 133 wind turbines, is being constructed in the southern provinces of Sekong and Attapeu. The wind power plant is expected to have a significant positive impact on the local economy by creating jobs and generating revenue for the government.

As the first wind power project in the country, Monsoon will help unlock the country’s substantial untapped wind resource potential. It will help reduce annual greenhouse gas emissions by at least 748,867 tons of carbon dioxide equivalent.

“The financing from ADB and its partners will help unlock the Lao PDR’s untapped wind resources, providing a basis for a transition to clean energy and green growth that will have lasting benefits for the economy,” said Suzanne Gaboury, director general for private sector operations at ADB.

Mobilizing Financing

Infrastructure projects that are pioneering, complex, large-scale, and cross-border have long gestation periods as they require substantial time for feasibility and impact studies as well as allowance for planning and approvals with multiple government entities on both sides of the border. ADB has worked closely with Impact Electrons Siam, the project developer, since 2015 by providing guidance to the developer on structuring an international bankable project. In 2021, ADB was officially mandated to lead the due diligence process and mobilize substantial commercial, developmental, and concessional funding for the project.

In 2023, ADB and the Monsoon Wind Power Company Limited signed a $692.6 million project financing package to build the Monsoon Wind Power Project in the Lao PDR.

As the sole mandated lead arranger and book runner, ADB arranged, structured, and syndicated the entire financing package—the largest syndicated renewal project financing transaction among ASEAN countries to date.

The financing package includes a $100 million A loan from ADB’s ordinary capital resources, $50 million in concessional financing from ADB-managed blended finance funds, and a $10 million grant from ADB’s Asian Development Fund–Private Sector Window to help mitigate key project risks, including potential curtailment risk, which is a key bankability issue for lenders.

The $150 million syndicated B loan comprises $100 million from Siam Commercial Bank and $50 million from Sumitomo Mitsui Banking Corporation.

Parallel loans include $120.0 million from the Japan International Cooperation Agency, $100.0 million from Kasikornbank, $72.6 million from the Asian Infrastructure Investment Bank, $60.0 million from the Export-Import Bank of Thailand, and $30.0 million from the Hong Kong Mortgage Corporation Limited.

“ADB’s cutting-edge use of blended finance and the grant from the Asian Development Fund–Private Sector Window were critical in overcoming the wind power plant’s bankability hurdles to crowd in commercial capital,” Gaboury said.

"The financing from ADB and its partners will help unlock the Lao PDR’s untapped wind resources, providing a basis for a transition to clean energy and green growth that will have lasting benefits for the economy."

~ Suzanne Gaboury, ADB director general for private sector operations

Share
Tags
climate change regional cooperation
Cost

  • ADB Resources $110 million

Cofinancing Partners

  • Asian Infrastructure Investment Bank (Loan) $72.6 million
  • Canadian Climate Fund for the Private Sector in Asia I (CFPS I) (Loan) $10 million
  • Canadian Climate Fund for the Private Sector in Asia II (CFPS II) (Loan) $20 million
  • Export-Import Bank of Thailand (Loan) $60 million
  • Japan International Cooperation Agency (Loan) $120 million
  • Leading Asia's Private Infrastructure Fund (Loan) $20 million
  • Kasikornbank (Loan) $100 million
  • Hong Kong Mortgage Corporation Limited (Loan) $30 million
  • Siam Commercial Bank (B Loan) $100 million
  • Sumitomo Mitsui Banking Corporation (B Loan) $50 million
Dates

Approval Date 3 November 2022

Signing Date 25 February 2023

Completion Date undisclosed

Knowledge Contributors

Kiron Nath, principal investment specialist, ADB

Robert Lockhart, senior investment specialist, ADB